Monthly Archives: May 2019

James Hardie reinstallation – Final walkthrough

Today, representatives of James Hardie and Dae Won Construction came to our property and reviewed/inspected the installation. 

Posted in Uncategorized | Comments Off on James Hardie reinstallation – Final walkthrough

James Hardie reinstallation concludes

Today, 5/20/2019 the installers finished the installation.  Tomorrow, Johnathan Cho of Dae Won Construction and Sergio Bojanic, James Hardie Building Products are planning to be at the property at about 12:30 pm to review the work.

Posted in Uncategorized | Comments Off on James Hardie reinstallation concludes

James Hardie reinstallation continues – 5

10 days into the reinstallation.  Everyday we have been dealing with nail gun pops and hammers banging on the walls.  The installers hope to finish in 2-3 days. The pictures below depict correctly installed flashing and blocking for penetrations.   … Continue reading

Posted in Uncategorized | Comments Off on James Hardie reinstallation continues – 5

James Hardie reinstallation continues – 4

The progress of the installation: Here is more evidence of the aluminum nails that are not supposed to be used with Hardie boards. Left of the house is done and it looks much better.  

Posted in Uncategorized | Comments Off on James Hardie reinstallation continues – 4

James Hardie reinstallation continues – 3

RE-Installation Continues –  The hardie re-installation damaged interior walls.  A nail almost came through in our son’s room. 2.  They have started the front and right side of the house 3.  This picture shows the flashing that was used between … Continue reading

Posted in Uncategorized | Comments Off on James Hardie reinstallation continues – 3

James Hardie reinstallation continues – 2

Here are few images of the progress… Correct flashing between the joints are being used now Here is what they used before…it looks like roof felt Electrical boxes and vents are now being boxed correctly.  Flashing is being applied. Now: … Continue reading

Posted in Uncategorized | Comments Off on James Hardie reinstallation continues – 2

James Hardie reinstallation continues

Two clips showing the work at the end of day one.

Posted in Uncategorized | Comments Off on James Hardie reinstallation continues

James Hardie reinstallation started

May 8, 2019 – Dae Won Construction Co., Inc. started to replace the Hardie siding on our home.  The house wrap is also being replaced. This picture below shows that many original end cuts were not painted after cutting them … Continue reading

Posted in Uncategorized | Comments Off on James Hardie reinstallation started

House Wrap and scheduleing

We received an email from Dae Won Construction Co., Inc. informing us that they are no longer planning to charge us for replacement of the House Wrap.  They have proposed to replace the house wrap with BARRICADE®WRAP PLUS.  The work … Continue reading

Posted in Uncategorized | Comments Off on House Wrap and scheduleing